The Repiping Process, Step by Step

A repipe runs in six steps: inspection and pressure test, written quote, permit and planning, install, pressure test and inspection, and patching. This guide walks through each one, with what the homeowner's part is at each stage and how long each step takes.

Updated 2026-11-18. Prices shown are estimates only.

Step 1: inspection and pressure test

Every repipe starts with a visit. The crew tests the water pressure, finds the pipe material, and maps the runs from the main to every fixture. The map is drawn up before any wall is opened, and it becomes the plan: which walls open, where the new lines run, and where the water is shut off each day.

The crew also looks at the water heater, the main shutoff, and the pressure regulator. The homeowner's part is small: clear access to sinks, toilets, the water heater, and the main shutoff, and move items away from walls where pipes run. The inspection produces a written quote, and the quote is given before any work is agreed.

Step 2: the written quote

The written quote lists the material and brand, the areas covered, the number of fixtures, the permit, the rough-in inspection, the patching scope, the cleanup, and the warranty. A quote that lists all of that can be compared with another quote that lists all of that. A quote that lists only a price cannot.

The quote should also show both materials — PEX and copper — so the choice is the homeowner's. If the quote looks far below the typical range, ask what it leaves out. Permits, patching, and inspection are the items most often missing from a low quote.

Step 3: permit and planning

The local company files the plumbing permit and books the rough-in inspection. The permit is usually a simple plumbing permit, and it takes a few days to come through. While it is pending, the crew plans the routes: which walls open, where the new lines run, and where the water is shut off each day.

The homeowner should ask for the permit number before work starts, so it can be checked with the city building department. Keep the number with the home's records. The permit is the city's record that the work was done to code.

Step 4: the install, room by room

The crew works room by room. Old lines are cut out or capped, new PEX or copper goes in, and the water is tested before the walls are closed. Each fixture gets a new shutoff valve. The old lines are capped and left in the walls, since removing them would mean opening far more wall.

The install takes two to five days for most single-family homes. The water is usually off only during working hours, and the crew restores it each evening. The crew protects floors, seals off rooms from dust, and cleans up each day. The homeowner can stay in the home through the work.

Step 5: pressure test and inspection

After the new pipes are in and before the walls are closed, the system is pressure-tested and the inspector visits. The inspector checks the pipe runs, the joints, the supports, and the pressure test result, then signs off. If anything needs fixing, it is fixed while the walls are still open.

The homeowner does not need to be present for the inspection, though many choose to be. The crew handles the scheduling and is there when the inspector comes. A second inspection is sometimes needed if the first finds a problem, and the crew handles that too.

Step 6: patching, cleanup and sign-off

The last step is patching, cleanup, and a final walkthrough. The drywall is patched, the texture and paint are finished as agreed in the quote, and the site is cleaned. The homeowner runs every tap, flushes every toilet, and checks the water heater with the crew before signing off.

The crew leaves the permit number, the inspection result, the warranty, and the material list with the homeowner. Keep those with the home's records: when the home is sold, the paperwork shows the repipe was done properly and inspected. From the first cut to the last patch, most homes are done inside a week. Call (833) 878-1592 to book the inspection that starts the process.

The bottom line on the process

A repipe runs in six steps: inspection and pressure test, written quote, permit and planning, install, pressure test and inspection, and patching. Most homes are done inside a week, with the water off only during working hours and restored each evening.

The homeowner's part is small: clear access, keep the driveway open, and check the work at each stage. The crew handles the rest: the mapping, the permit, the install, the inspection, and the patching. The final walkthrough is the time to check every tap, toilet, and shower with the crew before signing off.

The paperwork at the end matters as much as the pipe: the permit number, the inspection result, the warranty, and the material list. Keep those with the home's records. If anything is unclear at any stage, ask the crew before the walls are closed — that is the point of the inspection, and a good crew welcomes the question. Call (833) 878-1592 to book the inspection that starts the process.

How do you read a repipe quote?

A repipe quote is read line by line, not by the bottom number. The lines that matter are the material and brand, the areas covered, the number of fixtures, the permit, the rough-in inspection, the patching scope, the cleanup, and the warranty. A quote that lists all of those can be compared with another quote that lists all of those.

A quote that lists only a price cannot be compared with anything. If two quotes differ widely, the difference is usually in the lines, not in the price: one of them leaves out the permit, the patching, or the inspection. Ask each company the same questions and pick the one whose quote is complete.

What should the written quote list?

The written quote should list the material and brand, the areas covered, the number of fixtures, the permit, the rough-in inspection, the patching scope, the cleanup, and the warranty. It should list both PEX and copper prices, so the choice is the homeowner's, and it should state the timeline, including patching.

Anything missing from that list is a question, not a saving. Ask where the missing line is, and ask for it in writing. A company that will put everything in writing is a company that intends to do everything it lists.

How long do new pipes last?

PEX supply pipe is rated for about 40 to 50 years in normal use. Copper supply pipe commonly lasts 50 years or more, and many copper systems run 70 years. Both figures assume normal water, proper installation, and a pressure that stays in range.

The pipe is not the only part with a life: the fittings, the valves, and the water heater all age on their own schedules. The water heater will need replacing before the pipes do, and the new shutoff valves make that job easy. The pipes themselves, once installed and inspected, should be the last thing on the homeowner's mind for decades.

What is a pressure test, and why does it matter?

A pressure test is the repipe's pass-or-fail check. The new lines are filled with water and held at pressure, and the gauge must not move. If it moves, there is a leak, and the crew finds it before the drywall goes back.

The test also separates the causes of low pressure. Good pressure at the main with weak pressure at the taps means the pipes are the problem, and the test proves the new pipes have fixed it. It is a five-minute job that answers the question the whole repipe was meant to answer.

How do you choose between PEX and copper?

The choice is a trade between price, time, and lifespan. PEX costs less and installs faster, because flexible runs thread through walls with fewer openings and fewer joints. Copper lasts longer and handles heat better, because it is rigid metal with a century of history in US homes.

The quote should show both options, so the choice is made on the numbers for this home. The water test and the home — not the sales pitch — should decide. A good installer will show the cut-out section, explain what the water is doing to the old pipe, and price both materials.

What happens to the old pipes?

The old lines are drained, capped, and left in the walls. Pulling them out would mean opening far more wall, and there is no need: capped pipe carries no water and cannot leak. The new PEX or copper runs beside them or through new routes.

Where the old pipe is easy to reach — in a basement, a crawl space, or an open wall — the crew may remove it. Where it is buried in a finished wall, it stays, capped and out of service. The crew removes the cut-out sections and any debris at the end of the job.

How much mess does a repipe make?

The disruption is real but short. A few days of cutting and drilling, water off during working hours, and the crew in and out of the rooms where the pipes run. The crew protects the floors, seals the work rooms against dust, and cleans up before leaving each evening.

Most families stay in the home through the whole job. If the home has only one bathroom, the crew plans the work so it is out of use for as short a time as possible. The mess ends with the patching, and the home is put back as it was.

Can you stay in the home during the work?

Yes, in most cases. The crew works room by room and usually restores water each evening, so the household's routine bends rather than breaks. There is dust and noise, and some walls are opened, but families normally stay put.

If the home has only one bathroom, the crew plans the work so it is out of use for as short a time as possible. The crew checks in each morning with the plan for the day, so the household knows when the water will be off and when it will be back.

What does the permit protect?

The permit is a small part of the job and a large part of the protection. It costs little, it is usually included in the quote, and it creates the record that the work was done to code and inspected.

Ask for the permit number before work starts, so it can be checked with the city building department. Keep the number with the inspection result and the warranty. When the home is sold, those three documents answer the buyer's first plumbing question before it is asked.

How do you check a plumbing company's licence?

Ask the company for its licence number and check it with the state or local board before work starts. The check confirms the company is licensed for plumbing work where the home is, and that the licence is current.

If the company will not name its licence number, that is an answer too. The quote should name the company, not just a phone number, and the permit should be filed in that company's name. The homeowner should know exactly who is doing the work.

What is the difference between a repipe and a repair?

A repair patches the failure. A repipe removes the failing system. The difference is the scope: a repair leaves the old pipes in the wall, and a repipe takes them out of service.

A single leak is a repair, and the crew will say so. A pattern of leaks is a system, and the crew will say that too. The difference is the pipe material and the leak history, and both are visible on the inspection. The homeowner should get both prices in writing before deciding.

When is the best time to repipe?

The best time to repipe is before the pipes fail, and the inspection is how the homeowner knows when that is. A planned job costs less than an emergency one, and it can be booked when the household is ready.

Lead times run a few weeks in busy seasons, so the inspection should be booked early. The job itself takes a few days, and the water is restored each evening. Waiting until the pipe bursts adds a drying bill and a damage repair to the same job.

What records should you keep after the job?

Keep four documents: the permit number, the inspection result, the warranty, and the material list. Those four show the repipe was done properly, inspected, and warranted, and they answer the first question a buyer or an insurer asks about the plumbing.

Keep the written quote too, so the scope of the work is on record: which lines were replaced, which material was used, and what the patching included. If the home is sold, that folder is part of the value. If a problem ever appears, it is the record of what was done and who stands behind it.

How do you prepare a home for a repipe?

Clear access before the crew arrives: move items away from sinks, toilets, the water heater, and the main shutoff, and clear the walls where pipes run. Cover furniture near the work areas, and keep the driveway open so the crew can bring in pipe and tools.

The crew will say which rooms it needs first, and the homeowner can plan around that. Pets and small children should be kept out of the work rooms while walls are open. The preparation takes an hour or two, and it saves the first morning of the job.

What should you do in the first week after a repipe?

The first week is the check week. Run every fixture, look at every valve, and check the patching as it dries. A drip at a new valve, a patch that cracks, or a tap that runs weak should be reported to the company at once, while the crew is still nearby and the work is under warranty.

Keep the pressure in range, usually 40 to 80 psi, and watch the water meter with every tap off: a still meter means the system is tight. The final walkthrough catches most of these things, and the first week catches the rest.

Signs you may need repiping

  • An inspection that maps the system
  • A written quote that lists everything
  • A permit filed before work starts
  • New lines run room by room
  • A pressure test before the walls close
  • Patching and a final walkthrough
  • A pipe that has leaked twice in the same year
  • Water pressure that falls when a second tap opens

How it works

  1. 1

    Step 1 — Inspection and pressure test

    The crew tests the water pressure, finds the pipe material and maps the runs from the main to every fixture, so the quote reflects the home.

  2. 2

    Step 2 — Written quote and permit

    The local company quotes the job in writing — material, areas covered, patching and warranty — and files the plumbing permit.

  3. 3

    Step 3 — Install the new lines

    New PEX or copper runs through the walls, attic or crawl space, and each fixture gets a new shutoff valve.

  4. 4

    Step 4 — Test, inspect and patch

    The system is pressure-tested, the inspector checks the rough-in, and the walls are patched and cleaned up.

  5. 5

    Step 5 — Patching the walls

    Drywall patching follows the pipe work, and the quote says whether texture and paint are included. The walls are closed only after the inspection passes.

  6. 6

    Step 6 — Final walkthrough

    Every tap, toilet, and shower is run with the crew before sign-off, and the permit number, inspection result, and warranty are kept with the home's records.

What does it cost?

All figures are typical national ranges, shown as estimates only. The written quote from the local company replaces them once the pipes have been inspected.

ServiceTypical range (estimate)Notes
Whole-home repipe (PEX)$4,500 – $12,000Most 2–3 bed homes
Whole-home repipe (copper)$8,000 – $20,000Longer-lasting metal pipe
Partial repipe (one area)$2,000 – $6,000One bathroom or hot lines
Polybutylene replacement$5,000 – $15,000Full grey-pipe swap
Galvanized pipe replacement$5,000 – $15,000Old steel out, new pipe in
Pressure test & pipe inspection$150 – $400Standalone visit

Prices are estimates only. The local company that does the work sets its own final pricing.

Frequently asked questions

Related services

Related guides

View all guides →

Repiping in top cities

See all locations →

Get an estimate

Call for your estimate

Tell us what is happening and a local pro will take it from there. The call is free, and you agree on the price with the local company before any work starts.

(833) 878-1592How estimates work →

Lines answered 24/7.